Energy Storage News•about 1 month ago
Eolian and CyrusOne team up to deploy Texas data centre at site of 100MW BESS
- •CyrusOne and IPP Eolian are deploying a 200MW data center campus in Fort Worth, Texas.
- •The data center will be strategically located at an existing 100MW grid-scale Battery Energy Storage System (BESS) site.
- •This co-location strategy offers large power consumers and developers potential benefits including enhanced power reliability, optimized grid integration, and reduced transmission costs by leveraging existing energy infrastructure in the ERCOT market.
ercot