Back to News
POWER Magazine22 days ago

Framatome Selected to Deliver Critical Digital Control Upgrades at Columbia Generating Station

Key Takeaway

Modernization of existing baseload nuclear generation ensures continued grid reliability and operational efficiency, impacting long-term power supply stability for large consumers.

AI Summary

  • Framatome secured a contract to upgrade critical digital control systems at Energy Northwest’s Columbia Generating Station (nuclear).
  • The project encompasses system design, engineering, manufacturing, testing, and installation for new digital feedwater level control and feedwater heater vents and drains systems.
  • These upgrades aim to enhance the reliability and operational efficiency of an existing baseload nuclear power facility.

Topics

oem

Article Content

Framatome said it has been awarded a contract to upgrade several digital control systems at Energy Northwest’s Columbia Generating Station. The scope of the project includes system design, engineering, manufacturing, testing and installation for new digital feedwater level control and feedwater heater vents and drains systems. The upgrades announced December 4 are part of Energy […] The post Framatome Selected to Deliver Critical Digital Control Upgrades at Columbia Generating Station appeared first on POWER Magazine .