Back to News
CleanTechnicaabout 1 month ago

20 New EV Charging Ports Installed In Long Beach, CA

Key Takeaway

The installation of 20 Level 2 EV charging ports in Long Beach, CA, signals ongoing distributed load growth that will increasingly impact local grid infrastructure and regional power demand within the CAISO territory.

AI Summary

  • PowerFlex installed 20 Level 2 EV charging ports at the LACDA Carmelitos community in Long Beach, CA, in collaboration with LA County departments.
  • This project, though small, represents continuous, distributed load growth from EV adoption, impacting local grid infrastructure and future power demand.
  • Located within the CAISO service territory, these installations contribute to the region's increasing electricity demand driven by electrification initiatives.

Topics

caisointerconnectpolicytransmission

Article Content

PowerFlex recently collaborated with the Los Angeles County Internal Services Department and the Los Angeles County Development Authority (LACDA) to install 20 Level 2 electric vehicle charging ports at the LACDA Carmelitos community in Long Beach, CA. While 20 EV charging ports might not sound like that much, they are ... [continued] The post 20 New EV Charging Ports Installed In Long Beach, CA appeared first on CleanTechnica .